Details: earth work in excavation by mechanical means(hydraulic excavator/manual means in foundation, trenches or drains (not exceeding 1.5 mtr in width or 10 sqm on plan, including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out excavated soil and disposal of surplusexcavated soil as directed, within all leads and lifts of , any kind of soil. earthwork for surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including getting out and disposal of excavated earth within all leads and lifts , as directed by engineer-in-charge, in any kind of soil. boulder soling under floor/road/path dry hand packed tightly using boulders of size 5 cm to 15 cm. cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40mm nominal size) in pavements, laid to required and camber in panels as required including consolidationfinishing and tamping complete on roads providing and laying in position cement concrete of sp
Sector: Urban Authority