Details: earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom completeas per morth technical specification including hauling of material in all leads, lifts as per entire satisfaction and direction of engineer-in-charge including carriage of material within all leads,lifts and other incidental. the rates including royality, malkhana, octroi, toll tax, sale tax, gst or any other taxes imposed by the government. providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 (1:3:6) 1 cement : 3 sand : 6 aggregate of nominal 20mm size)as per morth technical specification including hauling of material in all leads, lifts as per entire satisfaction and direction of engineer-in-charge including ca
Sector: PWD