Details: dressing of bed and preparation of sub grade in pick work in all kind of soil within all leads and lifts as per the direction of engineer-in -charge. dressing of side and preparation of sub grade in pick work in all kind of soil within all leads and lifts as per the direction of engineer-in -charge. providing and laying cement concrete 1:4:8 ( 1 cement : 4 sand: 8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per the direction of engineer-in-charge. providing and laying cement concrete work 1 : 2 : 4 ( 1 cement : 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:- foundations footings, bases of drain, channel, and the like mass concrete within all leads and lifts as per direction of engineer-in-charge. walls of drain channel (any thickness but not less than 0.10 metre thickness) att
Sector: Medical and Health