Details: re / of stay set (ht). digging of pit, fixing of stay rod, filling of pit, nozzeling & tighting.) complete in all respect. errection of earthing (i) digging of pit (ii) fixing of g.i wire to the earth system, filling of pit. sagging of acsr conductor 6/1/3.35mm (single wire). laying of conductor (i) stringing & sagging (ii) binding with insulator. sagging of g.i wire for earth wire mannual carriage of h.t line material considering average distance 0.1 k.m. of 25kva s/stn. digging of pit for pole and earthing, drilling of holes in x-arm, preparation of plate form, str. member c.i a.i. x-arm, knee bracing set, of d-pole, c.c. , of plate form, of x-arm, dropout fuse unit, lightning arrester, mccb switch, l.t box, energy meter, of transformer, g.o switch, stay set, jumper earthing 3 sets, l.t cables, painting etc. (complete in all respect). mannual carriage of transformer material (dismentalled) from road head to site of work for an average distance of 0.100 km. providin
Sector: Distribution