Details: of 22kv h.t line of 10mtr. long st pole. of pole.digging of pit, (ii) laying of rcc (iii) drilling of holes in x-bracing set, x-arms (iv) of pole (v) fixing of insulator,x-arm, knee bracing set, top clamp (vi) fixing of barbed wire, danger plate (vii) filling of pit & ramming i/c painting of pole s/pole str. (complete in all respect). re / of stay set (ht). digging of pit, fixing of stay rod, filling of pit, nozzeling & tighting.) complete in all respect. sagging of acsr conductor 6/1/3.35mm (single wire). stringing & sagging, binding with insulator (only). sagging of g.i wire for earth wire of 25kva s/stn. digging of pit for pole and earthing, drilling of holes in x-arm, preparation of plate form, str. member c.i a.i. x-arm, knee bracing set, of d-pole, c.c. , of plate form, of x-arm, dropout fuse unit, lightning arrester, mccb switch, l.t box, energy meter, of transformer, g.o switch, stay set, jumper earthing 3 sets, l.t cables, painting etc. (complete i
Sector: Distribution