Details: demolishing lime concrete nominal concrete 1:3:6 (one cement isto three sand isto six ) manually/ by mechanical means and disposal of material all leads, lifts and other incidental. the rate is including the octroi, royality, malkana, toll tax, gst and any other taxes imposed by the government. excavation in foundation and trenches in all heights and depths and in all kinds of soil including saturated soils comprising of pick work, jumper work, pick jumper work, blasting work both in soft and hard rock, chiseling / wedging out of rock (where blasting is prohibited) and their intermediate classification of soil setting out true to the required lines, grade, width, cutting and trimming of side slopes as shown in the drawing and if water is met within the excavation due to springs, seepage, rain and other causes it shall be removed by the suitable diversion pumping or bailing out and excavation shall be kept dry wherever so required by the contractor at his own cost as directed by th
Sector: PWD