Details: re- conductring of 11kv ht line prov. acsr conductor acsr 30 mm² 6/1/2.59 sq. mm (prov. by hpsebl) prov. steel tubular poles 9 mtr. w/l 200kg (prov. by hpsebl) prov. muffs with concerete filling cross arm: [channel iron (75x40x6 mm), length: 1800 mm i/c tolerance of 100 mm either side) angle iron (50x50x6 mm), length: 750 mm x 2 no. pole top bracket [msci:(75x40x6 mm- 100 mm] prov. discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.) prov. half clamps: [on double pole dead end structure: 4 no; on run thro' structure: 2 no ] prov. stay set complete prov. stay wire (7/3.15 m) (7.0 kg per stay set) (prov. by hpsebl) prov. nuts and bolts of various sizes (galvanised / coated) [preferably 16 mm φ or more (with flat and spring washers)] prov. single continous earth wire (gi, 8 swg) (prov. by hpsebl) of st pole 9 mtr. long , digging of pit, errection of x-arm, shackle insulator, filling of pit , pa
Sector: Distribution