Details: qtr roof repair work demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. edges of slabs and breaks in floors and walls under 20 cm wide reinforced cement concrete work in beams, suspended floors, roofs having up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size). steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.thermo-mechanically treated bars of grade fe-500d or more. repair to plaster of 12mm to 20 patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the
Sector: Distribution