Details: excavation in foundations, trenches etc., in earth work, lift upto 1.50 metres stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within all leads and lift as per entiresatisfaction of engineer-in-charge providing and laying cement concrete 1:3:6 (1 cement:3 sand:6 graded stone aggregate 40mm nominal size) excluding the cost of centring and shuttering in foundations and plinthwithin all leads and lifts. providing and laying cement concrete 1:1.5:3 (1 cement :1.5: sand : 3 graded stone aggregate 20 mm nominal size and curing complete excluding cost of form work. & rein forcement for reinforces concrete work in :- foundation , footing, bases of columns and the like & mass concrete within all leads and lifts. wall ( any thick
Sector: Medical and Health