Details: earth work in excavation for all type of foundation of structure as per drawing and technical specification in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock, chiselling/wedging out rocks( where blasting in prohibited ) as per drawings and mort&h technical specification clause-304 and as per direction of the engineer-in-charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto all leads and lifts including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm ( one hundred fifty milimetres) compacted thickness including shoring and strutting and pumping and bailing out water ( surface and sub soil water ) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering. any loss to the public/ private property during the course o
Sector: PWD