Details: supply part 250 kva dtr prov. distribution transformer (ordinary) 250kva 11/0.4 kv. prov. pvc cable 3.5 core 300mm². prov. electronic trivector meter 400/5 amp. prov. lt distribution panel box with mccb (400a) 250kva . providing bed & fencing for 250 kva transformer. providing aluminium thimble. providing of m. s. nut and bolts with washers off sizes etc. these items should be free from any defects and cracks. prov. go ab switch unit (11kv, 400a, 25ka) tripple pole o/d type. prov. earthing set complete in all respect. /labour part 250 kva dtr of 250 kv, 11/0.4 kv sub station i.e. eraction of lt cable ,lt panel box with mccb, energy meter, eraction of jumper, of transformer, dismentalling of existing dtr, lt cable, lt panel box removal of jumpers & painting etc.to complete in all respect. add dismentalling charges of existing dtr with structure etc. add manual carrige of 250 kva dtr with other material from road side to site of work. average distance =0.300 km add manual
Sector: Distribution