Details: earth work in excavation for all types of road structures such as retaining walls, walls, culverts, drains, parapets and other similar structures in all kinds and classification of soil, comprising of ordinary mix soil, ordinary rock, hard rock, chiseling/wedging out rocks (where blasting is prohibited) complete in accordance with the lines and dimensions shown in the drawings, including setting out, construction of shoring, bracing, removal of stumps and other deleterious materials and disposal of excavated material upto any leads and lifts including dressing of sides and bottom and backfilling in trenches with excavated suitable approved materials to the original surface in layers not exceeding 150 mm (one hundred fifty milimeters) compacted thickness including shoring and strutting and pumping or bailing out water (surface and sub-soil water) up to any depth and any quantum of water and cleaning of slush which may arise out during dewatering complete as per drawing and mord t
Sector: PWD