Details: earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and back filling in trenches with excavated suitable material including all leads and lifts as per direction of the engineer-in-charge. (ordinary soil) providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 1:4:8 (1 cement 4 sand : 8graded stone agg. 40 mm nominal size )including all leads and lifts as per direction of the engineer-in-charge providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203including all leads and lifts as per direction of the engineer-in-charge 1:2:4 (1 cement2 sand : 4graded stone agg. 20 mm no
Sector: PWD