Details: earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth up to all lead and lift. providing and laying in position cement concrete of specifiedgrade excluding the cost of centering and shuttering - all workup to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10graded stone aggregate 40 mm nominal size) up to all lead and lift. dry stone pitching 22.5 cm thick / stone soling including supply of stones and preparing surface complete. up to all lead and lift. supplying and filling in plinth with sand under floors,including watering, ramming, consolidating and dressing complete up to all lead and lift. providing and laying in position cement concrete of specifiedgrade excluding the cost of centering and shuttering - all workup to plinth level : 1:2:4(1 cement : 2 coarse sand): 4 graded stone aggregate 20 mm nominal size) @6234.10
Sector: Urban Authority