Details: filling available excavated earth (excluding rock) in trenches plinth side of foundation etc. in layers not execeeding 20cm in depth consolidating each deposited layer by ramming and watering lead up to 50m and lift upto 1.50 mt including allm lead and lifts.
Sector: PWD