Details: excavation in earth work in hilly area in all heights and depths in all kind of soil by manual/mechanical means including saturated soil comprising of mixed soil, ordinary rock and hard rock all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side,water pollution, etcetra and to protect stability of hill side track shall be excavated with chiseling and wedging out rock (where blasting is prohibited). all earth work in cutting/excavation including rock excavation shall be carried,out true tolines,grades,side slopes, width, camber super-elevation and level as shown on the drawings or as directed by the engineer-in-charge,in conformit with the requirement of mord technical specification 2014 (two thousand fourteen) for rural road. clause 300, 1603 (three hundred, one thousand six hundred three) of general conditions for contract to achieve designed formation width including hauling and stacking of material u
Sector: PWD