Details: earth work in excavation by mechanical means (hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge. all kinds of soil . providing and laying cement concrete 1:5:10 and curing complete including the cost of formwork for plain / reinforced concrete in retaining walls, walls as per drawing and hp.pwd technical specifications. chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand) dark shade pigment using ordinary cement 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) finishing walls with water proofing cement paint of required shade : new work (two or more coats applied @ 3.84 kg
Sector: Urban Authority