Details: excavation in foundation and trenches etc.(in pipes and pits) in all kinds of soils such as pick work, jumper work, blasting in soft / hard rock, chiselling / wedging out of rock / where blasting prohibited) saturated soil stacking the excavated soil as directed by the engineer-in-charge clear from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the engineer –in-charge in all leads and lifts. providing and laying cement concrete 1: 4: 8 (1cement: 4 sand:8 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work foundation and plinth complete in all respect including all leads and lifts providing and laying cement concrete 1: 6: 12 (1cement: 6 sand:12 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work fou
Sector: Medical and Health