Details: excavation in foundation ,trenches etc in earth work in all kind of soil such as pick work, jumper work, blasting work and chiselling / wedging out of meteres cler from the edge of excavation and then returning the stacked soil in 15 cms layers,when required into plinths,sides of foundations etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth curing complete with in all leads and lifts and other incidentials complete and as per the entire satisfaction and direction of engineer-in-charge. providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. (thirty into thirty into five milimeter) so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs (four meter). and removal of the same for insitu-reinforced concrete & plain concrete work in: -
Sector: PWD