Details: dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. for thickness of tiles 10 mm to 25 mm demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) providing and laying pvc pipe 200 mm dia mr centering and shuttering including strutting, propping etc. and rem
Sector: Urban Authority