Details: construction of malawara batheri khalboot road in km 0/00 to 9/500. (sh:- construction of 900mm dia hume pipe culvert at r.d. 2/370 alongwith wing walls) 2,73,339.57 cost (in rs.) money (in rs.) tender form (in rs.) 5.500/- 350/- one month 5,500/- 350/- one month 350/- three months construction of malawara batheri khalboot road in km 0/00 to 9/500. (sh:- construction of 900mm dia hume pipe culvert at r.d. 2/460 alongwith wing walls). 2,73,339.57 construction of link road from health sub- centre tandoo at harizen basti choutta via palyar nallah chakkar shamshan ghat in km 0/00 to 4/00. (sh: construction of 900mm dia rcc hume pipe culvert alongwith wing wall at r.d. 0/850). 2,45,734.19 5,000/- construction of link road harizen basti ropru to nasloh km 0/00 to 3/500. (sh- culvert alongwith wing wall at r.d. 0/290) construction of 900mm dia hume pipe 2.49,097.60 4 5,000/- 350/- three months 5 construction of uhl valley road km 0/00 to 10/00. (sh:- construction of 900mm dia rcc hume pipe cu
Sector: PWD