Details: excavation in foundations , trenches etc., in earth work , lift up to 1.50 metres. stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15 cm. (fifteen centimetres) layers , when required in to plinth and sides of foundations etc., conslolidating each of the disposited layer by ramming and watering and then disposing off all excavated soil as directed with in the load of 20 mtrs. pick and jumper work etc. complete as per the direction of the engineer - in - charge. providing and laying cement concrete 1:4:8 (1cement: 4 sand: 8 graded stone aggregate 25mm (forty millimeter nominal size) and curing complete excluding cost of form work in foundation and plinth with in all leads & lifts as per direction of engineer - in charge. providing from work steel plates 3.15 mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish i/c centering, shuttering, strutting and propping
Sector: Medical and Health