Details: providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening/ binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading-iii (g-iii) as per technical specification. including hauling / carriage of all labour equipments and materials to various locations through all modes of transporations in all leads and lifts to the entire satisfaction as per direction of engineer-in-charge providing and applying prime coat with with bitumen vg-10 on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 to 1.00 kg per sqm using mechanical means as per technical specification clause 502. including hauling of materials in all kinds of leads ,lifts and other
Sector: PWD