Details: excavation in foundation for digging well in dry excavation from ground level upto the level where well crub is placed the level , where well crub is placed depth directed by the engineer-in-charge within all leads and lifts. wet well sinking graval including all pumping , soring etc with in all leads and lifts as per the direction of engineer-in-charge. a) from spring level to 3.00 mtr. depth b) from spring level to 3.00 mtr. to 6 .00 mtr depth c) from spring level to 6.00 mtr. to 9.00 mtr depth d) from spring level to 9.00 mtr. to 10.00 mtr depth steel work in single sections including cutting,hoisting,fixing in position and applying a priming coat of red lead paint in r.s.joists,channels angles,tees within all leads and lifts as per the direction of engineer-in-charge. lowering of well crub within all leads and lifts as per the direction of engineer-in-charge. providing and laying cement concrete 1:2:4(one cement is to two sand is to four graded stone aggregate 20 milimetre n
Sector: Medical and Health