Details: aug. of 63 kva to 100 kva ,11/0.4 kv s/stn. energy meter (3-p 4-wire) ct operated static tri-vector meter ( ct-100/5a) aluminium thimble aluminium thimble material part of lt line prov. d-iron (u-clamps) prov. earth hook / earth prov. l.t. stay set complete prov. stay wire(7/3.15mm)(6.0kg per stay) prov. stay clamp prov. gi wire 8swg(earth wire) prov. nut & bolts of various sizes (galvanised / coated ) [preferable 16 mm ø or more (with flat and spring washers )] part of aug. of 63 kva to 100 kva 11/0.4 kv s/stn. of 100 kv 11/0.4 kv transformer , lt penal box, energy meter ,lt cable including loading and unloading transformer and carriage of dismentelled 100 kva transformer from site of work to section store complete in all respect part of lt line of lt steel poles 8/9 mtrs long, shackle insulator with d-iron eye hook, digging of pole pit size 1.20x0.80x1.35 filling and ramming and painting etc complete in all respect eection of lt stay set, stay clamp, egg ins
Sector: Distribution