Details: earth work in excavation for all type of road structure such as retaining walls, walls, culverts, drains and parapets etcetera in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiseling /wedging out rocks (where blasting is prohibited) as per drawings and m.o.r.d. technical specification clause 305 and 1603.4 and as per direction of the engineer- in – charge including setting out, shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto any lead and upto any lift including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm ( one hundred fifty milimetres) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth and any quantam of water including cleaning of slush which may arrise out during dewatering as per direction of
Sector: PWD