Details: excavation in earth work and disposal of all excavated earth upto a lead of 20 meters and lift upto 1.50 meter, disposed earth to be levelled and neatly dressed. pick work providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-all work upto plinth level-1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) boulder filling dry hand packed tightly as in wire crate appron bund (wire crates to be measured separately) wire crates made of g.i. wire filledwith boulders with square cut faces against the wire (boulder filling to be measured and paid for separately) g.i. wire 5 mm thick corresponding to swg-8 15 cm mesh. providing and laying of g.i. lacing wire 4 mm thickness. boulder filling dry hand packed tightly under floors providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level : 1 :3:6 (1 cement :3 coarse sand ):6 graded
Sector: Urban Authority