Details: ( /labour part ht line ) of s/t pole 11 mtr long,(double pole structure) with rcc including digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, x-bracing set, x-arms, fixing of insulators, x-arms, x- bracing set, fixing of barbed wire, danger plate, filling of pit & ramming and painting of pole complete in all respects(c.c. 1:3:6 for muffing will be provided by the contractor). of stay set ht line, comprising digging of pit, fixing of stay rod, filling of pit, nozzeling and tightining complete in all respects. of h t line withacsr 100 mm²,(rabbit) 6/1/4.72 mm such as stringing, tensioning and sagging,jointing and fastening . mannual carriage of complete material of h t line from road side to site of work for average distance of 1 km lead. transportation charges for complete material of h t line @ 3% of material cost (supply part ht line)
Sector: Distribution