Details: demolishing cement concrete manually/ by mechanical means including disposal of material within50 metres lead as per direction of engineer - in - charge.nominal concrete 1:3:6 or richer mix (i/cequivalent design mix) centering and shuttering including strutting, propping etc. and removal of form work for : columns, pillars, piers, abutments, posts and struts providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level 1:4:8 (1 cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) providing and laying in position cement concrete of specified grade excluding the cost of centering andshuttering - all work up to plinth level 1:1½:3 (1 cement: 1½ coarse sand) : 3graded stone aggregate 20 mm nominal size) steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position andbinding all complete above plinth level providing and laying factory made chamfered ed
Sector: Urban Authority