Details: excavation in foundation for digging well in dry excavation from ground level upto the level where well crub is placed the level , where well crub is placed depth directed by the engineer-in-charge within all leads and lifts. wet well sinking graval including all pumping , soring etc with in all leads and lifts as per the direction of engineer-in-charge. a) from spring level to 3.00 mtr. depth b) from spring level to 3.00 mtr. to 6.00 metre depth c) from spring level to 6.00 mtr. to 9.00 metre depth d) from spring level to 9.00 mtr. to 12.00 metre depth e) from spring level to 12.00 mtr. to 14.00 metre depth steel work in single sections including cutting,hoisting,fixing in position and applying a priming coat of red lead paint in r.s.joists,channels angles,tees within all leads and lifts as per the direction of engineer-in-charge. in beams joints,channals,angles,tees,flats with concrete plates or angle cleets as in main and cross beams,hip and jack rafters,purlins connected t
Sector: Medical and Health