Details: excavation in foundations, trenches etc., in earth work, lift upto 1.50 metres stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required in to plinths sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as direction of engineer- in- charge with in all leads and lifts. supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level 1:4:8 (1 cement : 4 coarse sand 8 graded stone aggregate) 40 mm nominal size. steel reinforcement for r.c.c. work ready to use "cut and bend" rebars of approved make from factory/workshop to construction site including placing in position and binding all complete above plinth lev
Sector: Urban Authority