Details: operation, running and maintenance of stp 0.38 mld capacity and main trunk/distribution network of 7.86 km at badah having existing structures such as all civil works and electro mechanical equipments relating to sewerage system of kullu town which consist of main trunk sewer, manholes and entire sewer network for a period of one months by deploying of skilled/ semi skilled/ un skilled manpower such as assistant plant manager, supervisor, sewer man casual labour, electrician, chemist, operator, plumber, beldar etc in all respect and to the entire satisfaction of engineer-in-charge. firm should do comply the stringent effluent standards laid down by hp pollution control board and terms and conditions as per annexure alongwith other general terms and conditions.
Sector: Medical and Health