Details: excavation in foundation , trecnches etc., in all kinds of soil such as pick work, jumper work blasting work,kankar moorum,singles including decomposed soft and hard rock,including chiselling wedging clearance of bushes etc.including shoring, dewatering etc. in all leads and lifts stacking the excavated soil not more than 3 meters clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth and sides of foundation etc. consolidating each deposited layers by remming and watering and then disposing of all surplus earth within all leads and lifts complete to the entire satisfaction as directed by the engineer-in-charge of the site of work.(pick work 40%,jumper work 30% & chiselling work in soft rock and hard rock ) providing and laying cement concrete 1:4:8 (1cement, 4and 8 graded stone aggregate 20mm nominal size) complete excluding cost of work in foundatiion and plinth. providing form work with steel plated 3.15mm thick welded with an
Sector: Medical and Health