Details: excavation in foundation trenches etc. in all kinds of soil such as pick jumper work blasting soft or hard rock or by chiselling where blasting is prohibited soft/hard rock in all lifts stacking the excavated soil as directed by the engineer-in-charge clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the engineer-in-charge in all leads and lifts. providing and laying cement concrete 1:4:8 (1cement, 4and 8 graded stone aggregate 20mm nominal size) complete excluding cost of work in foundatiion and jplinth providing and laying cement concrete 1:1.5:3(1cement:1.5sand:3 graded stone aggregate 20mm nominal size)and including under water curing complete excluding the cost of form work and reinforced concrete work :- in foundation ,footing,bases of column and the like in vertical wal
Sector: Medical and Health