Details: earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.50 m, as directed by engineer-in-charge all kind of soil / ordinary rock earth work in excavation by mechanical means (hydraulic excavator)/manual means in foundation trenches or drains ( not exceeding 1.5 m in width or 10 sqm on plan) including dressingof sides and ramming of bottoms, lift upto 1.50 m, including getting out the excavated soil and disposal of surplus excavated soil as directed by engineer-in-charge ordinary rock dry stone soiling / pitching 15 cm thick including supply of stones and preparing surface complete p/l cement concrete 1:4:8 (1 cement:4 sand:8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth carriage of material in all lead and lifts providing and layi
Sector: Buildings