Details: excavation in foundation and trenches in all type of soil such as pickwork jumper work kankar, moorum, shingles including decomposed soft and hard rock etc. upto all heights stacking the excavated earth not more than 3mtrs clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths sides of foundations etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth in all leads and lifts & as per directed of the engineer in-charge. providing and laying cement concrete 1:5:10 (1cement:5sand:10graded stone aggregate 40mm nominal size) with 15% plum and curing complete excluding cost of form work in walls the size of plums shall usually be 150mm to 300mm as per hppwd specification. including entire carriage of material upto all leads and lifts. providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish. including centring,
Sector: Medical and Health