Details: excavation in drains and channels etc., in earth work including dressing of side and bed disposing of excavated earth upto a lead of 20mts and lift upto 1.5mts disposed earth to be levelled and neatly dressed in pick work providing and laying cement concrete 1:5:10 (1 cement :5 sand :10 graded stone aggregate 40mm nominal size) and curing complete excluding cost of centring and shuttering in: foundation and plinth : form work centering and shuttering including strutting, propping etc. and removal of form work for : walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. suspended floors, roofs, landings, balconies and access platform providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 40 mm nominal size) providing and laying in position specified grade of reinforced cement concrete, excluding
Sector: Urban Authority