Details: demolishing r.c.c. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of engineer - in- charge demolishing stone rubble masonry in cement mortar manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge : earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material including carriage of materials with in all leads, lifts and other incidentals complete as per entire satisfaciton of the engineer-in-charge. stone soling properly hand-packed filling interstices with kharanja stone and consolidating with power road roller to the requested gradient and comber including spread
Sector: PWD