Details: excavation in drain and channel etc in classification of all kinds of soil such as pick work, , jumper work, blasting work soft /hard rock, chiesling soft /hard rock lift upto 1.50 metres stacking the excavated soil with 15cm layer when required into plinth ,sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus earth in pick and jumper work as per direction of engineer-in-charge with in all leads and lifts . providing and laying cement concrete 1:4:8(1 cement: 4sand: 8graded stone agg. 40mm nominal size)and curing complete excluding cost of form work in foundation and plinth within all leads and lifts. providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish i/c centring, shuttering, propping etc.height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs.height of propping and centring below supporting removal of the same fo
Sector: Medical and Health