Details: demolishing r.c.c. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of engineer - in- charge. centering and shuttering including strutting, propping etc. and removal of form for suspended floors, roofs, landings, balconies and access platform providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) brick work with common burnt clay f.p.s. (non modular)bricks of class designation 7.5 in superstructure aboveplinth level up to floor v level in all shapes and sizes in cement mortar 1:6 (1 cement : 6 coarse sand) long wall 15 mm cement plaster on the rough side of single or halfbrick wall of mix : 13.2.2 1:6 (1 cement: 6 fine sand) long wall steel reinforcement for r.c.c. work including str
Sector: Urban Authority