Details: earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. providing and laying cement concrete 1:5:10 (1 cement :5 sand :10 graded stone aggregate40 mm nominal size) and curing complete including cost of centering and shuttering in foundation and plinth including carriage of materials within all leads and lifts complete in all respect. providing form work with centering and shuttering including strutting, propping etc. and removal of form work for retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. centering and shuttering including strutting, propping etc. and removal of form for suspended floors, ro
Sector: Urban Authority