Details: civil work earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10sqm on plan), including dressing of sides and rammingof bottoms, lift upto 1.5 m, including getting out theexcavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil. stone soling properly hand-packed filling interstices with kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per hp.pwd specification. 100 mm spread thickness (finished work including materials and labour) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) providing and laying in position cement concrete of
Sector: Urban Authority