Details: excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per technical specification clause 1603.1 providing and laying cement concrete 1:4:8 (1 cement:4 sand:8 graded stone aggregate 40mm nominal size) curing complete including cost of centring and shuttering in foundations and plinth and super structure all floors within all leads and lifts complete in all respect. plain/reinforced cement concrete in substructure complete as per drawings and technical specification clauses 802,804,805,806,807,1202 & 1204. rcc grade m25 ( 1:1.5:3 upto 5 mtrs height ) including cost of form work, centering, shuttering etc. providing mild / tor steel reinforced cement for rcc. work including bending binding and placing in position complete up to floor all level. providing
Sector: Urban Authority