Details: earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all lead and lift. demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) pcc below drain providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 40 mm nominal size) taking out existing cc interlocking paver blocks from footpath/ central verge, including removal of etc.,disposal of unserviceable material to the dumping ground, for which payment
Sector: Urban Authority