Details: schedule ‘a’ part - i ( platform of transformer and panel board earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including dressing of sides and ramming ofbottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. providing and laying in position cement concrete of 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size derived from natural sources) excluding the cost of centering and shuttering, all work up to plinth. brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in foundation and plinth in: cement mortar 1:6 (1 cement : 6 coarse sand) mix providing and laying in position cement concrete of 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) excluding the cost of cente
Sector: Police and Internal Security