Details: excavation for foundation of footing,walls,ramps. pit for septic tank and soak pit,water pond etc. with all leads and lifts stacking the material in the compound cleaning the trenches for bed concrete and re-filling the excavated stuff with ramming. watering and consolidating and carting away the surplus matarial in the compound or outside as directed.(up to 50m lead) filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. filling in plinth with approved good quality imported moorum or earth in 200-300 thick layers with ramming watering and consolidating the soil at each layer volume providing and doing 230 mm thick dry rubble soling providing and laying pcc of grade m10 in foundations below walls, footing, beams, etc. with ramming
Sector: Industries and Factories