Details: excavating holes more than 0.10 & upto 0.5 including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. all kinds of soil centering and shuttering including strutting, propping etc. and removal of form work for :foundations, footings, bases for columns providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-iii) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) providing and fixing bolts including nuts and washers complete. welding by gas or electric plant including transportation of plant at site etc. complete. applying priming coat:with ready mixed red oxide zinc chromate primer of a
Sector: Police and Internal Security