Description: Reactivation Maint and Resuscitation of Borewell at Happy Valley Name of Work Reactivation Maint and Resuscitation of Borewell at Happy Valley
Details: Material &Labour for carrying out Geo Physical Survey for ground water exploration by electrical resistivity technique at different location spread at suitable intervals to find out delineation of litholigical features of area thickness of layers and most favorable site for ground water strata based on geological parameters and disposition of sub surface formation aquifer up to depth of 200 mtrs and submitted a detail report in this regard Transportation of Rig and Other Equipment’s, at site and dismantling after completion of the work as directed by the Engineer-in-Charge Material &Labour for Trial Bore of pilot hole of 150mm dia at any kind of soil incl Hard Rock / boulder by direct rotary rig machine or Down The Hole Drilling and keeping soil samples at every 3.00 Mtr or wherever there is a change in strata upto the required depth till suitable water bearing strata is obtained (i) From Ground Level to 60 Mtr (ii) From 60 Mtr to not exc 120 Mtr (ii) From 120 Mtr to not exc 250 Mtr
Sector: Police and Internal Security