Details: schedule ‘a’ part - i (rain water harvesting view point at bn klp) earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil. providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - all work upto plinth level .1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns pillars, piers, abutments, posts and struts etc. up to floor five l,excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggr
Sector: Police and Internal Security