Description: Provn of Constr of RCC Retaining wall and Rehabilitation to arrest soil subsidence in front of G III Type II bldg for 28 Assam Rifles at Tuensang Nagaland Name of Work Provn of constr of RCC retaining wall rehabilation of artrest soil subsidence in front of G II Type II bldg for 28 Assam Rifles
Details: Demolishing cement concrete mannually/by mechanical means including disposal of material within 50 mtr lead as per direction of Enbgineer-in-charge./ Nominal concrete 1:4:8 or leaner mix (i/c equcvalant design mix) Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Ce
Sector: Police and Internal Security